11–13 Apr 2016
ETSI Telecomunicación, UPM
Europe/Rome timezone

Programme

The programme has been detailed in the Timetable tab (see left links). It is composed of this main sessions:

Monday 11th (starting at 09:00 CEST)

  • Registration (From 9:00 to 9:30)
  • Welcome and Updates on the LMC front from Trieste, including a report from the ANT team (9:30-10:45)
  • Considerations on ready/set/go or ready/go architectures (11:15-12:30)
  • CSP architecture: Intro, Context, and detailed architecture of SKA1-Mid and SKA1-Low (13:30-15:00, and 15:30-17:00)

Tuesday 12th (beware, starting at 08:45 CEST)

  • CSP Control design and prototyping (8:45-11:00), and discussions (11:30-12:30)
  • DSH Control architecture overview (13:30-15:00), and interfacing with TM (15:30-17:00)

Wednesday 13th (starting at 9:00 CEST)

  • Session recaps (9:00-9:30)
  • DSH control architecture: GUIs, alarms, prototyping, and qualification (9:30-10:15)
  • Discussions, agreements, and next steps (11:15-13:30)